Industrial Drive Lift Station Reconstruction
The City is reconstructing the lift station on Industrial Drive from mid-March through May 2024. The existing lift station, constructed in the late 1970s, will be converted into a modern submersible pumping station with new pumps, controls, and telemetry based on the City’s current standards. This project is essential to ensuring a reliable wastewater system.